| Verification Items (Overview) | Demo Test | Results of Demonstration Testing | Evaluation |
|---|---|---|---|
| • Stable shutdown when plant malfunctions. | Test the interlocks to confirm safe plant shutdown. |
• Interlock testing confirmed stable shutdown when system malfunctions were simulated.
|
Confirmed that system is stable. |
| Test period: FY 2007 Status: Completed. |
|||
| • Safe handling of coal gas. | Check and adjust plant operating status, and confirm that coal gas is handled safely and that operation is stable under rated load. |
|
|
| Test period: FY 2007 Status: Completed. |
| Verification Items (Overview) | Demo Test | Results of Demonstration Testing | Evaluation |
|---|---|---|---|
| • Running continuously for 2000 hours (equivalent to 3 months of summer). | Run continuously for 2000 hours. |
|
Achieved continuous-run target. Going forward, will also check durability over mid-to-long-term continuous operation. |
| Test period: FY 2008 Status: Completed. |
| Verification Items (Overview) | Demo Test | Results of Demonstration Testing | Evaluation |
|---|---|---|---|
| • Collecting data while running on coal types outside of the design specs. | Check operation when using sub-bituminous coal (North American, Indonesian A). |
|
Analyzed operation when using three coal types outside the range of the design specs, collecting data to be used to support design of commercial-level facilities. In some cases, SGC heat-transfer piping downstream of the gasifier became clogged. Results made it clear that various countermeasures would be required to prevent problems caused by different coal types. |
| Test period: FY 2008 Status: Completed. |
|||
| Check operation when using sub-bituminous coal (North American). |
|
||
| Test period: FY 2009 Status: Completed. |
|||
| Run plant with the purpose of enabling use of mainstream coal types beyond those covered by the design specs, and of sub-bituminous types capable of single-fuel firing. |
|
||
| Test period: FY 2010 Status: Completed |
| Verification Items (Overview) | Demo Test | Results of Demonstration Testing | Evaluation |
|---|---|---|---|
| • Achieving targeted thermal efficiency (LHV 42% at sending end). | Verify efficiency; investigate whether reasonable to anticipate efficiency enhancements sufficient for commercial use. | By adjusting running parameters, able to confirm an LHV of 42.9% at the sending side, surpassing the goal of 42% LHV. | Confirmed high efficiency. |
| Test period: FY 2008 Status: Completed. |
| Verification Items (Overview) | Demo Test | Results of Demonstration Testing | Evaluation |
|---|---|---|---|
| • Running for long period, followed by overhaul inspection. | Run for 5000 hours, then did overhaul inspection to evaluate durability. |
|
Confirmed that the tested equipment has an appropriate IGCC design. Going forward, will also check durability over mid-to-long-term continuous operation. |
|
| Verification Items (Overview) | Demo Test | Results of Demonstration Testing | Evaluation |
|---|---|---|---|
| • Evaluating economic feasibility based on operational performance. | Used operational performance as a basis for comprehensive evaluation of costs (construction costs, operating costs, maintenance costs, etc.); and evaluated whether this approach would be economically feasible in a commercial environment. |
|
Based on the results, it seems quite possible that gasified coal may deliver power-generating costs equal to or lower than those for pulverized coal. But will need to enhance precision of these systems for lower repair costs. |
| Test period: FY 2010 Status: Completed. |
| Verification Items (Overview) | Demo Test | Results of Demonstration Testing | Evaluation |
|---|---|---|---|
| • Confirm the mid-to-long term durability of the igcc facilities including countermeasures implemented during the past testing. | These studies as follow conducted.
|
|
in progress |
| Confirm the mid-to-long term durability with te results of further operation in 2012. | - |
| Verification Items (Overview) | Demo Test | Results of Demonstration Testing | Evaluation |
|---|---|---|---|
| • Establish the measures against the troubles accompanied by some coal types. | Another types of bituminous coal, that is, columbian Russian and Indonesian coals are to be in use and operational data to be collected in 2011. |
|
in progress |
| Another types of coal are to be tested in 2012. | - |
| Verification Items (Overview) | Demo Test | Results of Demonstration Testing | Evaluation |
|---|---|---|---|
| • Increase in samples of maintenance and inspection results for analysing the maintenance cost which should be compatible with conventional purverized coal fired generation. | Study on the cost reduction methods at commercial stage reflecting the operation and maintenance results in 2011. |
|
in progress |
| Cost reduction measures are to be worked out reflecting the operation and maitenance experiences in 2012. | - |